Wilman Wadandi Highway (Bunbury Outer Ring Road Project)

Under constructionUnder Construction

A 27-kilometre four-lane, high standard road linking Forrest Highway to Bussell Highway. The project will ease congestion and provide safer, more efficient traffic routes for freight, tourists, and locals. Banner photo: Paris Road and Clifton Road Interchange

Wilman Wadandi Highway <em>(Bunbury Outer Ring Road Project)</em>

Ongoing Roadworks

Bussell Highway near Grevillea Road
From 23 June 2025
  • New U-turn and slip lane on Bussell Highway at the intersection of Grevillea Road opens
  • Map
  • Travel Map
Wilman Wadandi Highway, and associated road network
14 July to early-September 2025, Monday to Saturday, 7am to 7pm
  • Intermittent short-term lane closures for landscaping, quality inspections and minor finishing works.
  • Speed limit reduced to 60km/h.
  • Locations include:
    • Wilman Wadandi Highway, between Paris Road and Grevillea Road
    • Raymond Road, between Tern Place and Treendale Road
    • South Western Highway North, between Discovery Road and Litmus Road
    • Discovery Road, between Wilman Wadandi Highway and Fusion Road
    • Golding Crescent, between Martin-Pelusey Road and Boyanup Picton Road
    • Willinge Drive, between Lillydale Road and South Western Highway South
    • Lillydale Road, between Bussell Highway and South Western Highway South
    • Jilley Road, between Lillydale Road and Woods Road
    • Yalinda Drive, between Cokelup Road and Woods Road
    • Bussell Highway, between Lillydale Road and Grevillea Road
Wilman Wadandi Highway near Willinge Drive
25 August to 8 September 2025, 7am to 7pm
  • Southbound slip lane from the Wilman Wadandi Highway to Willinge Drive Lane closure
  • Slip lane re-opens nightly from 7pm-7am with speed reduction to 60 km/h
  • Detour Map
  • Travel Map
See more projects news »
Understanding ‘To Stalk the Horizon’ - the Harris Road Mural

Understanding ‘To Stalk the Horizon’ - the Harris Road Mural

Designed by Joanna Brown, the noise walls at the Harris Road shared path crossing of the Wilman Wadandi Highway will feature a unique artwork which ties into the project’s Urban Design Strategy.

The Moore Road Mural – A tribute to local landscapes and culture

The Moore Road Mural – A tribute to local landscapes and culture

The Moore Road Mural is the latest public art commission for the Wilman Wadandi Highway (the Bunbury Outer Ring Road project), capturing the essence of the area, and Bunuru, the driest of the Noongar seasons through a rich yet minimalist narrative.

Introducing ‘Transition’ – the latest artwork to be unveiled on the Wilman Wadandi Highway

Introducing ‘Transition’ – the latest artwork to be unveiled on the Wilman Wadandi Highway

Designed and painted by Kyle Hughes-Odgers, the screen walls on the northern side of the mega-bridge will feature a unique design which ties into the project’s Urban Design strategy.

Discover the Wilman Wadandi Highway

Discover the Wilman Wadandi Highway

Safer, easier and more reliable trips through the South West are almost here.

See more projects news »
Native plants

Environment

Learn more »
Bright and colorful Aboriginal artwork

Aboriginal Engagement

Learn more »
27 km

key transport corridor

Safer

local roads

Improved

traffic flow

Page last reviewed:  | Last updated: 

Acknowledgement of Country

The Government of Western Australia acknowledges the traditional custodians throughout Western Australia and their continuing connection to the land, waters and community. We pay our respects to all members of the Aboriginal communities and their cultures; and to Elders both past and present.

Tell us what you think

Help us improve our website by sharing your thoughts and suggestions.

Provide feedback