Joondalup Drive, Tapping
Metropolitan region
Joondalup Drive between Burns Beach Road and Waldburg Drive, Tapping - Roadworks
- Works have commenced until Tuesday 3 November 2020 - 24 hour works
If any part of the combination or load exceeds 3.5 m in width, a 1.2 m Ground Clearance is required and operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated. Operators with a ground contact width exceeding 3.5 m are required to seek an alternative route.
Contact: Darius Kuseliauskas 0408 490 336