Brand Highway, Shire of Dandaragan
Wheatbelt region
Brand Highway on Bridge #0966 Hill River, Shire of Dandaragan - Bridge works
- Monday 27 July 2020 to Friday 30 October 2020, 24 hour works
If any part of the combination or load exceeds 3 m in width, a 1.2 m Ground Clearance is required and operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated. Operators with a ground contact width exceeding 3 m are required to seek an alternative route.
Contact: Andrew Withers 0424 204 138