What’s happening
Walyalup Bridge opened on 1 November 2026
Walyalup Bridge opened on Sunday 1 November with a wonderful community celebration. The event attracted nearly 20,000 people who enjoyed the opportunity to walk across the bridge before it opened to traffic late on Sunday evening. We thank everyone for joining in this historic occasion.
Heritage and culture have been embedded within the design of the new crossing, with storytelling incorporated through architecture and urban landscape design, public art, feature lighting, signage and wayfinding.
The surrounding area will also acknowledge the evolution of Fremantle's river crossings, including through the retention of timber piles from the former Fremantle Traffic Bridge and interpretation of remnants associated with earlier crossings.
See the Design Story fact sheets below for more details.
Fact Sheets
- Fact Sheet - Public Art: The Waugyl (Rainbow Serpent) - PDF (238 KB)
- Fact Sheet - Public Art: Aligia Dwert Biddi (The Dingo Trail) - PDF (3.22 MB)
- Fact Sheet - Telling the River's Stories - PDF (6.01 MB)
- Fact Sheet - Architecture, Urban and Landscape Design - PDF (1.09 MB)
- Fact Sheet - Design vision and future of the crossing - PDF (3.39 MB)
Lighting program testing continuing
Finishing works will continue on the bridge and surrounding area after the opening, and the feature lighting program will be finalised during that time. Testing started in mid-September and will continue after the bridge opens.
An innovative and unique program of architectural and feature lighting has been prepared to celebrate stories of the crossing that date back thousands of years, reflecting four broad heritage themes:
- The cultural and spiritual significance of the river landscape.
- The history of engineering innovation and river crossings (bridges).
- The river crossing as a gateway between north and south of the river.
- The signals and markers that have guided movement along the river for generations.
See our Design Series Lighting Fact Sheet.
Road Network Update
Following the bridge opening, the temporary road network changes made prior to the bridge closure will be lifted, including access to and from Fremantle via Canning Highway, and other initiatives that helped keep the network flowing during closure.
See our fact sheet for details.

