Heavy Vehicle Travel Impacts

We have made some changes to the way we let you know about HVS Updates.  To ensure you continue to receive Heavy Vehicle Travel Impacts notifications, please ensure your subscription service is current by following these easy steps:

  • Log into your "My Account"
  • Select Main Roads Subscriptions Service
  • Select Subscription Selection
  • Drop down the Using Roads menu item
  • Drop down Heavy Vehicles
  • Select pages you want to stay updated to
  • Click save subscription

 

Operators of Performance Based Standards (PBS) vehicle combinations should contact the Network Access area of Heavy Vehicle Services by calling the Heavy Vehicle Helpdesk on 138 486 or email - HVSnetworkaccess@mainroads.wa.gov.au  to determine if a suitable detour route is available.

OSOM movements

Network vehicle movements​

​Published

OSOM movements and detailed information

​Contact details

​Metropolitan region
​12/11/2019Roe Hwy Northbound, Kalamunda.

Roadworks 150m north of Kalamunda Road to Maida Vale Road.

 

Tuesday 12th November 2019 to Monday 25th November 2019.  24/7

 

If any part of the combination or load exceeds 3.7m in width and 5.48m in height, operators are required to seek an alternative route.

Timo Schwarz

0472 805 251

​11/11/2019Anketell Road, Hope Valley.

Road Closed between McLaughlan Road and Abercrombie Road.

Monday 11th November 2019 to Wednesday 13th November 2019.  7pm to 5am.

Operators are required to seek an alternative route.

Patrick Rose

0404 457 922

​11/11/2019

Ferguson Street, Kewdale.

Road Closed between Kewdale Road and Abernethy Road.

Works have commenced and will continue to Wednesday 20th November 2019. 7am to 5pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

WARP Traffic Management

(08) 9493 8700

​11/11/2019

Warwick Road, Greenwood.

Roadworks between Mitchell Freeway and Coolibah Drive.

Sunday 24th November 2019 to Tuesday 26th November 2019. 8pm to 6am.

If any part of the combination or load exceeds 3.5m in width, operators are required to seek an alternative route.

Aaron Willetts

0428 181 867

​08/11/2019

Kwinana Freeway, City of Cockburn.

Kwinana Freeway northbound on ramp to Roe Highway eastbound closed ramp.

Friday 8th November 2019 to Thursday 14th November 2019. 8pm to 4am.

Operators are required to seek an alternative route.

Pedro Simao

0428 185 417

​08/11/2019

Kwinana Freeway, City of Cockburn.

Kwinana Freeway southbound on ramp to Roe Highway eastbound closed.

Sunday 10th November 2019 to Monday 11 November 2019. 7pm to 5am.

Operators are required to seek an alternative route.

Pedro Simao

0428 185 417

​08/11/2019

Roe Highway, Kalamunda.

Roadworks 150m north of Kalamunda Road to Maida Vale Road.

Monday 11th November 2019 to Friday 1st May 2020.  24/7

If any part of the combination or load exceeds 6.4m in width, a 1.2m Ground Clearance is required and operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

Timo Schwarz

0472 805 251

​08/11/2019

Leach Highway, Bateman.

Roadworks between Risley Street and Kwinana Freeway.

Sunday 17th November 2019 to Monday 18th November 2019. 7pm to 6am.

If any part of the combination or load exceeds 3.2m in width operators are required to contact the site 12 hours prior to commencing their movement to ensure the load can be accommodated.

Rowan Wiltshire

0448 997 406

​08/11/2019

Farrington Road, Murdoch.

Roadworks between Bibra Drive and Murdoch Drive.

Monday 11th November 2019 to Sunday 17th November 2019. 24/7

If any part of the combination or load exceeds 3.0m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

Pedro Simao

0428 185 417

08/11/2019

Mitchell Freeway Northbound, City of Stirling.

Ramp closures will be in place from 9pm to 5am.

Hutton Street on ramp, Sunday 17th November 2019.                                          Hutton street off ramp, Monday 18th November 2019.

Cedric Street off ramp, Tuesday 19th November 2019.

Karrinyup Road off ramp, Monday 25th November 2019.

Operators are required to seek an alternative route.

 

Michael Bone

0438763967

​08/11/2019

Mitchell Freeway Northbound, City of Stirling.

Mitchell Freeway northbound closed between Hutton Street and Erindale Road.

Sunday 10th November 2019 to Wednesday 4th December 2019. 9pm to 5am.

If any part of the combination or load exceeds 3.2m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure they can be accommodated.

Michael Bone

0438763967

​04/11/2019Spearwood Avenue, Yangebup.

Roadworks between Beeliar Drive and Barrington Street.

Monday 4th November 2019 to Wednesday 4th December 2019. 7am to 2.30pm

If any part of the combination or load exceeds 3.2m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Aaron Willetts

0428 181 867

​04/11/2019

Marmion Avenue, Kallaroo.

Roadworks between Hampshire Drive and Sanderling Street.

4th November 2019 to 8th November 2019. 9am to 3pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Adriano Novello

0407 010 275

​04/11/2019Leach Highway, Bateman.

Roadworks between Amur Road and Murdoch Drive.

Night works: Monday 11th November 2019 to Thursday 14th November 2019.  8pm to 5am.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Silvano Reardon

0435 498 602

​16/10/2019Abernethy Road, Hazelmere.

Roadworks on Abernethy Road and Yagine Close Roundabout.

Nightworks 6pm Friday 22nd November 2019 to 6am Saturday 23rd November 2019.

If any part of the combination or load exceeds 3.5m in width, operators are required to seek an alternative route.

​Michael Newman

0488 700 386

​20/08/2019Karel Avenue, Leeming.

Roadworks between Farrington Road and Berrigan Drive.

Monday 19th August 2019 to Friday 31st July 2020. 7am to 5pm.

If any part of the combination or load exceeds 3.2m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure they can be accommodated.

Adam Sofoulis

0427 814 912

18/01/2019​

15/01/2019

Kwinana Freeway Northbound: Off ramp to Roe Highway Eastbound.

Wednesday 23 January 2019 - Ongoing.

If any part of the combination or load exceeds 4m in width a 1.2m Ground Clearance is required and  operators are required to contact the site 24 hours prior to commencing their movement. 

Operators with a ground contact width exceeding 4m or who cannot achieve a 1.2 ground clearance are required to seek an alternative route.

​Pedro Simao

0428 185 417

​05/09/2018

​Hepburn Avenue: Between Bellefin Drive and Marshall Road.

Saturday 8 September 2018 - Ongoing

Due to the construction of footbridge #9425 the maximum permitted height of any combination is restricted to 5.3m.

Operators with combinations exceeding 5.3m in height are required to seek an alternative route.

17/09/2018​

21/03/2018

Nicholson Road: Between Riva Entrance / Piara Drive and Swamp Road, ​Forrestdale

24/7 ​Works have commenced and are due to conclude on Tuesday 31 December 2019.

If any part of the combination or load exceeds 3.2m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure that the load can be accommodated.

Pedro Simao
0428 185 417

Gascoyne - Mid-West Region
​08/11/2019

Northwest Coastal Highway, Glenfield.

Roadworks between Tramway Road and Beattie Road.

Monday 11th November 2019 to Monday 18th November 2019. 6am to 6pm.

If any part of the combination or load exceeds 4.0m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

Matt Lawrie

0477 670 009

​01/11/2019Northwest Coastal Highway, Shire Of Carnarvon.

Roadworks between Carbla Road and Meedo Road.

Friday 1st November 2019 to Monday 11th November 2019. 6am to 6pm.

If any part of the combination or load exceeds 4.0m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Matt Lawrie

0477 670 009

​09/10/2019Coalseam Road, Shire Of Mingenew.

Roadworks between Mingenew-Morowa Road and Nanekine Road.

Works have commenced and will conclude Sunday 1st March 2020. 6am to 7pm.

If any part of the combination or load exceeds 4m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Alex Sharpe

0477 509 961

​14/02/2019

Ullawarra Road / Edmund Gifford Creek Road:  Upper Gascoyne.

Thursday 14 February 2019 - 31 January 2020. 24/7.

Operators using the flood affected sections of Ullawarra Road / Edmund Gifford Creek Road are reminded to drive to the current road conditions.  We urge operators to obey all road signage and traffic management that may be encountered due to the repair works currently being undertaken in the area.​​

All vehicles are advised to contact the Shire of Upper Gscoyne for road conditions prior to departure.

​Wayne Linke

0429 812 988 or

0145 354 759

​18/01/2019

​Coalseam Road: Bridge #3019 (Lockier River), Mingenew.

Works have commenced to Thursday 31 December 2020.

If any part of the combination or load exceeds 3.5m in width a 1.2m Ground Clearance is required.

Operators with a ground contact width exceeding 3.5m or who cannot achieve a 1.2 ground clearance are required to seek an alternative route

​Goldfields Region
​04/11/2019Eyre Highway, Shire of Dundas.

Roadworks between Coolgardie-Esperance Highway and Loongana-Madura Road.

Sunday 10th November 2019 to Thursday 21st November 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Richard Nyengera

0428 843 980

​04/11/2019Great Eastern Highway, Shire of Coolgardie.

Roadworks between Marvel Loch-Yellowdine Road and Anzac Drive.

Thursday 7th November 2019 to Tuesday 12th November 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Richard Nyengera

0428 843 980

​04/11/2019Coolgardie-Esperance Highway, Shire of Dundas and Esperance.

Roadworks between Kingswood Street and Lake Road.

Saturday 9th November 2019 to Tuesday 12th December 2019.  6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Richard Nyengera

0428 843 980

​04/11/2019Goldfields Highway, Shire of Mezies, Leonora and City of Kalgoorlie/Boulder.

Roadworks between Smelterman Drive and Ten Mile Outcamp Road.

31st October 2019 to 9th November 2019. 6am to 6pm

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Richard Nyengera

0428 843 980

​17/10/2019​Anzac Dr, Boulder.
Road closed from Great Eastern Hwy to Broadwood St.

 

7am Saturday 19th of October 2019 to 5:30pm Friday 20th of December 2019.
 
For all combinations not exceeding 3.5m in width and/or 5.8m in height, operators are required to seek an alternative route.

If any part of the combination or load exceeds 3.5m in width and/or 5.8m in height operators are required to contact the site 48 hours prior to commencing their movement to ensure they can be accommodated.

​Bill Mann
0408 708 024

Lou Hiemstra
0428 433 977

​04/10/2019Great Eastern Highway, Kalgoorlie.

Roadworks at the intersection of Great Eastern Highway and Gatacre Drive.

Saturday 5th October 2019 to Tuesday 3rd March 2020. 7am to 5.30pm

If any part of the combination or load exceeds 3.2m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Bill Mann

0408 708 024

Lou Hiemstra

0428 433 977

​09/08/2019West Kalgoorlie Road, West Kalgoorlie.

Road Closed at the Intersection of Great Eastern Highway.

Wednesday 14th August 2019 to Saturday 30th November 2019. 7am to 5.30pm.

Operators are required to seek an alternative route.

​Bill Mann

0408 708 024

Lou Hiemstra

0428 433 977

​09/08/2019Great Eastern Hwy, West Kalgoorlie.

Road works at the Intersection of West Kalgoorlie Road and Anzac Drive.

Wednesday 14th August 2019 to Saturday 30th November 2019. 7am to 5.30pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure they can be accommodated.

Bill Mann

0408 708 024

Lou Hiemstra

0428 433 977

​29/07/2019Great Eastern Highway, West Kalgoorlie.

Roadworks between Anzac Drive and Gatacre Drive.

Thursday 25th July 2019 to Tuesday 31st March 2020. 7am to 5.30pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure they can be accommodated.

​Bill Mann

0408 708 024

Lou Hiemstra

0428 433 977

Great Southern Region
​04/11/2019Springdale Road, Shire of Ravensthorpe.

Roadworks between Daniels Road and Lakes Road.

Tuesday 5th November 2019 to Thursday 7th November 2019. 7am to7pm.

If any part of the combination or load exceeds 2.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Rachael Chung

0406 966 931

​17/10/2019Northam-Cranbrook Road (Great Southern Highway), Shire of Woodanilling.

Bridgeworks on Bridge #0345 (Boyerine Creek).

Tuesday 22nd October 2019 to Wednesday 13th November 2019. 7am to 4pm

If any part of the combination or load exceeds 4.0m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Tony Webb

0417 916 596

​09/08/2019South Coast Highway, Jacup.

Bridgeworks on Bridge #0563 (Fitzgerald River).

Wednesday 21st August 2019 to Friday 22nd November 2019. 6.30am to 5pm.

Operators with combinations with a ground contact width exceeding 5m are required to seek an alternative route.

Eli Wettstein

0418 927 861

​Kimberley Region
​15/08/2019​ ​Lake Argyle Road, Lake Argyle.

Roadworks approximately 15kms West of Victoria Highway.

Tuesday 20th August 2019 to Friday 29th November 2019. 5.30am to 5pm.

If any part of the combination or load exceeds 3.0m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure they can be accommodated.

​Jordan Kippin

0455 214 979

​Pilbara Region
​16/09/2019Great Northern Highway, East Pilbara.

Bridgeworks on Bridge #1141 (Tin Dog Creek-Catchment)

Works have commenced and will conclude on Saturday 30 November 2019. 24/7.

If any part of the combination or load exceeds 4.8m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure they can be accommodated.

If any part of the combination or load exceeds 7.4m in width, a 1.2m Ground Clearance is required and operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated. Operators with a ground contact width exceeding 7.4m are required to seek an alternative route.

​Peter Ellis

9172 8824

Trent Morley

9172 8818

​27/08/2019Onslow Road, Shire Of Ashburton.

Roadworks between Onslow - Peedamulla Road and Twitchin Road.

Monday 26th August 2019 to Sunday 22nd December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width, a 1.2m Ground Clearance is required and operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

If any part of the combination or load exceeds 6.5m in width, operators are required to seek an alternative route.

​Mike Boynes

0427 788 898

Keith Conroy

0429 566 441

​South West Region
​04/11/2019South Coast Highway, Shire of Manjimup and Denmark.

Roadworks between Broke Inlet Road and Rice Road.

Wednesday 11th December 2019 to Friday 20th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated.

​Richard Nyengera

0428 843 980

​04/11/2019Caves Road, City of Busselton.

Roadworks between Siesta Park Road and Clubhouse Drive.

Wednesday 6th November 2019 to Monday 11th November 2019. 7am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Travis Johnston

0419 930 594

​04/11/2019Muir Highway, Shire of Manjimup.

Roadworks between Holleys Road and Toponup Road.

Monday 4th November 2019 to Friday 13th December 2019. 7am to 5pm.

If any part of the combination or load exceeds 3.0m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Troy Anderson

0438 734 908

​23/10/2019Boyup Brook-Cranbrook Road, Shire Of Boyup Brook.

Roadworks between Jayes Road and Winnejup Road.

Monday 21st October to Friday 22nd November 2019. 7.30am to 4.30pm.

If any part of the combination or load exceeds 3.0m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

Tony Bogar

0427 651 222

​​09/10/2019Railway Road, Elgin.

Roadworks between Clarke Road and Nicholls Road.

Thursday 10th October 2019 to Friday 22nd November 2019. 6am to 6pm.

If any part of the combination or load exceeds 3m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

Paul Neenan

0409 636 748

26/09/2019Ludlow-Hithergreen Road, Hithergreen.

Roadworks between Princefield Road and Sidebottom Road.

Monday 30th September 2019 to Saturday 30th November 2019. 6.30am to 4.30pm.

If any part of the combination or load exceeds 3.0m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure they can be accommodated.

​Shane Urbini

0428 540 560

​19/09/2019Bussell Highway, Capel.

Roadworks between Spur Street and Ludlow - Hithergreen Road.

Monday 23rd September 2019 to Thursday 19th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure they can be accommodated.

Kelvin Roberts

0498 988 199

​Wheatbelt Region
​11/11/2019

Midlands Road, Shire of Moora.

Roadworks between Kalinga Road and Dargai Street.

Friday 8th November 2019 to Thursday 12th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 4.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

Evan Harvey

0477 670 551

​11/11/2019

Midlands Road, Shire of Moora.

Roadworks between Namban West Road and Railway Road.

Friday 8th November 2019 to Thursday 12th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 4.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

Evan Harvey

0477 670 551

​22/10/2019George Rock Lake Grace, Shire Of Kulin.

Roadworks between Jilakin St and Jilakin Rock Rd North.

Wednesday 23rd October 2019 to Friday 6th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 4.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

Evan Harvey
0477 670 551
​​22/10/2019Narrogin Kondinin, Shire Of Kulin.

Roadworks between 2km south of Davies Rd and 3km north of Graham Rd.

Wednesday 30th October 2019 to Tuesday 10th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 4.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Evan Harvey
0477 670 551
​17/10/2019Northam-Cranbrook Road (Great Southern Highway), Shire Of Pingelly.

Roadworks between Paragon Street and Dents Road.

Tuesday 22nd October 2019 to Friday 20th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Andrew Fourie

0429 610 502

​​17/10/2019Northam-Cranbrook Road (Great Southern Highway), Shire Of Wagin.

Roadworks between Ballagin Street and Arthur Road.

Tuesday 22nd October 2019 to Friday 20th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours.

​Andrew Fourie

0429 610 502

​​17/10/2019Northam-Cranbrook Road (Great Southern Highway), Shire Of Wagin.

Roadworks between Riseborough Road and Lime Lake Road West.

Tuesday 22nd October 2019 to Friday 20th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours.

​Andrew Fourie

0429 610 502

​04/11/2019


10/10/2019

Great Eastern Highway, Shire Of Westonia.

Roadworks between Warralakin Road and Carrabin South Road.

Monday 14th October 2019 to Friday 24th April 2020. 7am to 5:30pm.

If any part of the combination or load exceeds 3.5m in width, a 1.2m Ground Clearance is required and operators are required to contact the site 48 hours prior to commencing their movement to ensure the load can be accommodated. Operators with a ground contact width exceeding 3.5m are required to seek an alternative route.

​Adam Halaby

0457 458 254

​​09/10/2019Goomalling-Wyalkatchem Road - Shire Of Goomalling.

Roadworks between Northam Pithara Road and Rifle Range Road.

Monday 14th October 2019 to Friday 20th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Stuart Martin

0437 824 139

​​09/10/2019Goomalling-Wyalkatchem Road - Shire Of Dowerin.

Roadworks between Jones Street and Amery Road.

Monday 14th October 2019 to Friday 20th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Stuart Martin

0437 824 139

​​09/10/2019Goomalling-Wyalkatchem Road - Shire Of Wyalkatchem.

Roadworks between Benjaberring-Hindmarsh Road and Cemetery Road.

Monday 14th October 2019 to Friday 20th December 2019. 6am to 6pm.

If any part of the combination or load exceeds 3.5m in width operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Stuart Martin

0437 824 139

26/09/2019Brand Highway, Muchea.

Roadworks between Great Northern Highway and Peters Road.

Works have started and are ongoing to Thursday 19th December 2019. 7am to 6pm.

If any part of the combination or load exceeds 7.5m in width, a 1.2m Ground Clearance is required and operators are required to contact the site 24 hours prior to commencing their movement to ensure the load can be accommodated.

​Carmen Maynard

0419 902 360

​26/11/2018

Albany Highway, Shire of Williams.

Bridgeworks on Bridge #0025 (Williams River)

Monday 26 November 2018 to Monday 2 March 2020. 24/7.

If any part of the combination or load exceeds 4.0m in width operators are  required to seek an alternative route.

​Gavin Crowther

0419 042 426

26/11/2018​

21/11/2018

Albany Highway: Bridge #0024 (Coalling Brook)​. Williams.

Monday 26 November 2018 to Monday 2 March 2020. 24/7.

If any part of the combination or load exceeds 5m in width operators are  required to seek an alternative route.

​Gavin Crowther

0419 042 426

​15/11/2018

Toodyay - Bindi Bindi Road​: Bridge # 0700 Nambling Brook. Toodyay.

Thursday 15 November ongoing. 24/7

No vehicle or combination exceeding a statutory mass is permitted to cross Bridge #0700.

Operators are required to seek an alternative route.

Published

Network vehicle movements and detailed information

​​Contact Details

​Metropolitan Region
​11/11/2019

Anketell Road, Hope Valley.

Road Closed between McLaughlan Road and Abercrombie Road.

Monday 11th November 2019 to Wednesday 13th November 2019.  7pm to 5am.

Operators of RAV Network 4 and below combinations a detour is available via Thomas Road.

Patrick Rose

0404 457 922

​11/11/2019

Ferguson Street, Kewdale.

Road Closed between Kewdale Road and Abernethy Road.

Works have commenced and will continue to Wednesday 20th November 2019. 7am to 5pm.

Operators of RAV Network 7 combinations and below are required to check relevant road network tables and seek an alternative route.

WARP Traffic Management

(08) 9493 8700

​08/11/2019

Kwinana Freeway, City of Cockburn.

Kwinana Freeway northbound on ramp to Roe Highway eastbound Closed.

Friday 8th November 2019 to Thursday 14th November 2019. 8pm to 4am.

Operators of RAV Network 4 and below combinations a detour is available via South Street.

Operators of RAV Network 5 to 7 and below combinations are required to call UHF CH40, they will then be escorted through the site when it's safe to do so.

Pedro Simao

0428 185 417

​08/11/2019

Kwinana Freeway, City of Cockburn.

Kwinana Freeway southbound on ramp to Roe Highway eastbound Closed.

Sunday 10th November 2019 to Monday 11th November 2019. 7pm to 5am.

Operators of RAV Network 4 and below combinations a detour is available via Kwinana Freeway, Berrigan Drive, Karel Avenue and Roe Highway.

Pedro Simao

0428 185 417

08/11/2019

 

Mitchell Freeway Northbound, City of Stirling.

Ramp closures will be in place from 9pm to 5am.

Hutton Street on ramp, Sunday 17th November 2019.

Hutton street off ramp, Monday 18th November 2019.

Operators of RAV Network 2 combinations and below are required to check relevant road network tables and seek an alternative route.

 

Michael Bone

0438763967

​Gascoyne - Mid West Region 
​Goldfields Region
​17/10/2019​Anzac Dr, Boulder.
Road closed from Great Eastern Hwy to Broadwood St.
No access onto or from Great Eastern Hwy

7am Saturday 19th of October 2019 to 5:30pm Friday 20th of December 2019.
 
Operators of RAV Network 10 and below combinations a
detour is available via Kakarra Rd and Broadwood St.

​Bill Mann
0408 708 024

Lou Hiemstra
0428 433 977

​09/08/2019

West Kalgoorlie Road, West Kalgoorlie.

Road Closed at the Intersection of West Kalgoorlie Road and Anzac Drive.

Wednesday 14th August 2019 to Saturday 30th November 2019. 7am to 5.30pm.

Operators of RAV Network 10 and below combinations a detour is available via Craig Road.

​​​

Bill Mann

0408 708 024

Lou Hiemstra

0428 433 977

​Great Southern Region
​Kimberley Region
​ ​
​​Pilbara Region
​South West Region
​16/11/2018Loverock Road​: Bridge # 4715 Boorara Brook. Manjimup

Friday 16 November ongoing. 24/7

No Restricted Access Vehicles are permitted to cross Bridge #4715 Boorara Brook.

Operators are required to check the relevent road network tables and seek an alternative route.

​Wheatbelt Region
 ​15/11/2018Toodyay - Bindi Bindi Road​: Bridge # 0700 Nambling Brook. Toodyay.

Thursday 15 November ongoing. 24/7

No Restricted Access Vehicles are permitted to cross Bridge #0700.

Operators are required to check the relevent road network tables and seek an alternative route.

Carmen

0419 902 360

  

Modified: 12 Nov 2019