Upgrading Wanneroo Road to a dual carriageway from Joondalup Drive to Flynn Drive will enhance road safety and efficiency and reduce travel times. The project will also cater for long-term traffic demands generated by rapid population growth in Perth’s north-west metropolitan corridor.

The project will convert the existing single-lane road to a four-lane dual carriageway over 3.2 km that provides a north-south alternative to Mitchell Freeway and is critical for efficient industry connectivity to the Wangarra and Neerabup industrial parks.

 

Project scope

The key project elements are:

  • Intersection upgrades at Golf Links Drive and Carramar Drive (seagull island design);
  • Construction of 3.2km of dual carriageway within the road reserve;
  • Noisewalls along the eastern side of Wanneroo Road between Joondalup Drive to north of Carramar Drive, Carramar; and
  • Drainage, retaining walls and landscaping.

 

Expected timeframe

Design and construct contract: award October 2017 (estimated)

Construction start: late 2017 (estimated)

Construction completion: late 2018 (estimated)

 

Current activity

An industry briefing was held on 2 February in response to an Expression of Interest advertised on 24 January 2017.

 

Further information

For further information about the project, please contact our Customer Information Centre on 138 138 or enquiries@mainroads.wa.gov.au

 