Northbridge Tunnel closure

​The Northbridge Tunnel will be closed in both directions on Friday 19 July from 8.30pm to 5am.

The closure is scheduled to facilitate maintenance works, including but not limited to:

  • Deluge and fire system testing:
  • Cleaning walls, lights and signs;
  • Road surface inspection; and 
  • Jet fan inspections. 

There​ has not been a forced closure due to a system malfunction as a result of the rigid and regular two-monthly maintenance regime. ​

Plan your trip using our Travel Map and follow us on our metropolitan Twitter account @Perth_Traffic for the latest traffic updates. 

Image: Northbridge Tunnel image.PNG 

Image: Northbridge Tunnel

 

Modified: 17 Jul 2019