UsingRoads

Highway Works

Stay informed... 
You can be notified as soon as a change is made to this page? To find out more please visit our Subscriptions page
Let us know what you think 
We would love to know what you think of our new site. Simply submit your comments to us using our Complaints & Feedback form.
 

Updated 6 November 2009

  Website Feedback Survey

We want to know how well the site is meeting your needs. Please take a moment and help us improve our service for you.  

 

 

Great Eastern Highway

Kellerberrin works
27 October to mid-December
7.00 am to 6.00 pm

Drainage works will be carried out daily and will incolve intermittent lane closures and speed restrictions.

Operators of oversize loads wider than 4.0 metres must contact the site 24 hours prior to their proposed move - please call 138 138.

 

Great Northern Highway

Roe Highway intersection
Ongoing from 6 October for 8 week period
NIGHT WORKS - 8.00 pm to 6.00 am

Disruptions are expected for westbound traffic on Roe Highway as works are carried out. Please adhere to traffic management in place.

 

Muchea to Waddington
Ongoing during November

Construction activities with speed restrictions and lane closures apply on the following sections:

  • Brand Highway and Muchea East Road intersection - 60 km/h during work hours and 80 km/h other times;
  • A 4 km section located 10 km south of Bindoon - 60 km/h speed limit;
  • Various locations within a 30 km section between Longbridge Gully and New Norcia;
  • 6 km section 7 km north of New Norcia - 80/60/40 km/h during work hours; and 80/60 km/h other times.

 

Kimberley Region
  • Bow River Bridge and 20 km north.  Side tracks and speed restrictions are in place.  Parking Bay 5 km north of Bow River Bridge is closed until December 2009.  The next available sign posted parking bays are 35 km north or 20 km south. Completion expected late 2009
  • Intersection with Lissadell Road (Argyle turn off) modified with traffic management in place.  Works are expected to be completed by late 2009.
  • Side tracks are in place at Fletchers Creek between Halls Creek and Kinunurra with 60 km/h speed restrictions in place until 11 November.
  • Stabilisation repair works are in progress at the Big Mabel Bridge between Halls Creek and Kununurra.
  • Roadworks are in progress between Brooking Chanel Bridge and Fitzroy River Bridge. Completion expected 8 November.
  • Roadworks are in progress 40 km north of Halls Creek. A 5 km long sidetrack is in operation immediately north of Sandy Creek.  Motorists should be aware of speed restrictions.
  • Resealing works are in progress on the Wyndham Spur.
  • Resealing works are in progress between Derby/Fitzroy turn-off and Fitzroy Crossing.
  • Shoulder maintenance is in progress between Willaire and Roebuck Roadhouse.

Top 


Leach Highway

Albany Highway (Welshpool) to Tonkin Highway (Cloverdale)
Ongoing from 29 October for 2 week period
7.00 am to 5.00 pm

Shoulder grading works will be carried out in both directions. Lane closures will be in place and delays can be expected during this time.

 

Reid Highway

West Swan Road to Great Northern Highway
Ongoing until mid-November
NIGHT WORKS - 7.00 pm to 5.00 am

The roundabout at the Great Northern and Roe Highway intersection is now open. 

Motorists can expect delays and light vehicles have the option to use an alternative route via Oakover, Campersic and Toodyay Roads when travelling between Great Northern and Roe Highway. Please drive with caution and adhere to the street signs.   

Top 

Roe Highway

Great Northern Highway intersection
Ongoing from 6 October for 8 week period
NIGHT WORKS - 8.00 pm to 6.00 am

Disruptions are expected for westbound traffic as works are carried out. Please adhere to traffic management in place.

 

Stirling Highway

Eric Street to Kings Park Avenue
5 to 16 November
NIGHT WORKS - 7.00 pm to 6.00 am

Resurfacing works will be carried out. The road will be closed to traffic with detours in place - delays can be expected.

 

Tonkin Highway

Guildford Road to Redcliffe Bridge
20 to 30 October
NIGHT WORKS - 7.00 pm to 6.00 am

Resurfacing works will be carried out. Lane closures and delays can be expected.

 

West Coast Highway

Scarborough Beach Road to Manning Street
Ongoing until December

Ongoing road and footpath construction works will be carried out. Some lane closures will be in place and motorists may experience some delays during this time.

Top