OPERATING CURFEW
JUNCTION OF PARKER POINT RD AND DAMPIER HWY
The intersection of Parker Point Road and Dampier Highway in Dampier is experiencing increased traffic volumes and is of concern particularly during peak periods where triple road trains are mixing with large volumes of light vehicles.
Upgrade works are being planned, however, until such time as these works are completed, the following triple road train curfews have been put in place to ensure safety at the intersection.
TRIPLE ROAD TRAIN CURFEWS
No access is permitted through the Parker Point Road/Dampier Highway intersection for triple road trains during the following periods:
Monday to Friday:
- 6.00 am to 7.00 am;
- 11.00am to Midday; and
- 4.00 pm to 6.00 pm.
PERIOD
Until further notice.
Mark Walker
Director Heavy Vehicle Operations
16 March 2006