Link to the Data Lodgement Guideline for the lodgement of survey, mapping, geodetic and design data for Main Roads projects.
To find out more about the replacement of TNCs and the introduction of ISAs please visit our Integrated Services Arrangements pages
The attached flowchart summarises the operation of the Prequalification System.
The attached document is provided for the information of prequalified contractors reviewing CPRs. Details of what the scores used in the CPR mean can be found in the report under item 8.2.